Decks & General Contracting
Outdoor builds and whole-project management, handled by one crew from start to finish.
Built to last, framed to code

Deck with Railing & Steps

Deck Framing In Progress
One point of contact for larger projects
As general contractors, we also manage larger remodeling projects end to end — coordinating painting, drywall, and plumbing under one schedule and one point of contact. No juggling separate crews or chasing down subcontractors.
- Deck & outdoor structure builds
- Multi-trade project coordination
- Full-room & whole-home remodels

Deck and general contracting costs and timelines
Typical ranges for Hampton Roads homes. Your free written estimate sets the exact price.
Deck painting or staining
$1,000–$3,500 · 2–4 days
Includes washing, sanding or scraping, and sealing so the finish lasts.
Repairs (boards, railings, steps)
$300–$2,500 · 1–3 days
Replacing rotted boards and loose railings before they become safety problems.
Railing & stair upgrade
$1,500–$5,000 · 2–4 days
New railings and steps built to current code.
New pressure-treated deck (about 12×16 ft)
$8,000–$16,000 · 1–2 weeks
Framing, decking, railing, and steps with corrosion-resistant fasteners.
Composite deck (about 12×16 ft)
$15,000–$30,000 · 1–2 weeks
Higher upfront cost with less maintenance over time.
Larger remodel or addition
Custom quote · Varies
One crew and one point of contact across multiple trades.
How we work
Decks fail at the connections, so we build them with properly flashed ledger boards, corrosion-resistant fasteners, and railings that meet current code. For larger projects, our painters, remodelers, and plumbers work as one crew with a single point of contact, instead of leaving you to coordinate separate contractors.
We serve homeowners in Newport News and across the Peninsula, including Hampton, Williamsburg, Yorktown, Poquoson, and York County.
Deck construction and general contracting: common questions
Do I need a permit to build a deck in Newport News?
Most Hampton Roads localities require a building permit for a new deck and for replacements that change the structure. Repainting, staining, or swapping a few boards generally does not. We confirm the requirements with your locality before we start.
Should I choose pressure-treated wood or composite?
Pressure-treated lumber costs less upfront and works well when sealed or stained every couple of years. Composite costs more but needs little maintenance and does not rot or splinter. We will talk through your budget and how much upkeep you want.
How long does a deck last in coastal Virginia?
A well-built pressure-treated deck commonly lasts 10–20 years with regular sealing, and composite often carries manufacturer warranties of 25 years or more. Humidity and salt air shorten the life of poorly protected wood, so finish and fasteners matter.
When can a deck be stained or painted?
You need a stretch of dry weather, usually two to three days, and the wood must be fully dry. Spring and fall are ideal. Staining a deck in damp conditions or in direct midday summer heat leads to peeling.
What does general contracting from your crew mean?
Painting, drywall, remodeling, and plumbing are all done by our own crew. For a bigger project, you get one estimate, one schedule, and one person to call instead of coordinating several contractors.
Planning a deck or bigger project?
Tell us the scope and we'll put together an honest, free estimate — no pressure.
Get My Free Estimate